Client challenge
Unsupported controllers and limited spare parts put the cell at risk. The original logic worked, but documentation was thin and a hard cutover was not acceptable.
PLC · HMI · SCADA / Rockwell · GE · Keyence
Migrated an aging PLC-5 cell to ControlLogix with a controlled cutover plan that protected production windows.
36 hrs
Cutover window
240
I/O points migrated
0 hrs
Unplanned downtime
Unsupported controllers and limited spare parts put the cell at risk. The original logic worked, but documentation was thin and a hard cutover was not acceptable.
We mapped I/O and sequences, converted and validated logic in stages, and coordinated HMI updates plus Keyence inspection signals. Cutover was planned around a short production window with rollback checkpoints.